Designed by
Title
Tunnel 1 km long that leads to what was once a lake, near the city of Valle de Santiago, Guanajuato Mexico. #144628963
Description
In the tunnel, you have to walk down, since the height from floor to ceiling is no more than 1.60 meters. When crossing the view it is striking for the greatness of what was once a lake and that is currently dry.