Designed by
Title
Team maintenance of the railway #22183449
Description
The team of track maintenance of railway sleepers operates change. The wooden sleepers are replaced by concrete sleepers. This requires great strength of the workers. The transaction is between two passes of the train because it is the only way that leads to Hanoi. Men have a special technique to raise the ballast. A guide to the shovel, the other two pull the shovel with a rope.
This image is editorial