Designed by
Title
Sewerage pipes from the toilet above are interconnected under the floor soffit. Installed in gradient and gravity flow. #238183206
Description
PENANG, MALAYSIA -JANUARY 5, 2021: Sewerage pipes from the toilet above are interconnected under the floor soffit. Installed in gradient and gravity flow. Channeled to the main sewer line.
This image is editorial