Designed by
Title
The Silver Line will ride on these pilings #258045732
Description
While the station construction for the SIlver Line seems to be on schedule, it is in this section that the train will go above grade to pass over a major highway and again rise above grade for its approach into the UTDallas Campus station down the line. It is a slow process to allow proper curing of the cement.
This image is editorial