Designed by
Title
Suralaya Steam Power Plant & x28;PLTU& x29; Units 9 and 10 2×1,000 Megawatts #262922100
Description
The physical construction of the Suralaya Unit 9 and 10 Steam Power Plant & x28;PLTU& x29; with a total capacity of 2Ãâ1,000 Megawatts & x28;MW& x29; is projected to begin in January 2020 in line with the finalization of funding for the construction of the power plant. PT Indoraya Energi, the joint venture company that built PLTU Suralaya Units 9 and 10, revealed that Indonesia Power, as the holding company or 51% shareholder of PLTU Suralaya units 9 and 10, will only provide the land. For funding or construction costs, it will fully rely on external funds or loans.