Designed by
Title
Bore pile and excavated pile #69447661
Description
JOHOR, MALAYSIA -JUNE 16, 2015: Excavated bore pile and ready to cut to designated level at the construction site. The bore pile must cut before can fabricate the pile cap.
This image is editorial